Current work

Bentleigh

Melbourne

A period bathroom stripped back to its framing, with a glass-block window and original cornice above
Builder
Siji Projects
Stage
On site · remediation and new bathrooms
Scope
Early contractor involvement (ECI) · Surface drainage engineering · Landscape design · Subfloor remediation · Mould treatment and testing · New bathrooms

The project

A period home with a moisture problem

Long-standing moisture had taken hold under this period home in Bentleigh, and mould had spread through the affected rooms.

The owner brought us in before the scope was fixed, so the job could deal with the cause of the water, not just the damage it had done.

A decorative period plaster cornice with the wall lining peeled back below it
A wall lining removed to reveal the timber framing and insulation behind
Affected linings stripped back to structure, with the original plaster cornices recorded before any removal

Early involvement

The work before the building work

Through early contractor involvement we delivered the drainage engineering, a landscape design to move water away from the house, and the subfloor remediation costings, all before construction started.

The mould was handled by specialists. Independent spore sampling first, IICRC-certified treatment, then completion testing to confirm the rooms were clear before they were closed up.

A bathroom reframed back to studs, with new plumbing rough-in and the subfloor opened up
A member of the Siji Projects crew on site in a branded polo
From documentation to delivery, new framing, services and subfloor set out for the new bathrooms

Across the Bentleigh works, from strip-out to new bathrooms

Why Siji

Fix the cause, then build

Rebuilding the damaged rooms without fixing the drainage would have brought the mould back. Getting in early meant the ground levels, the drainage and the subfloor were sorted before the new bathrooms went in.

It is a small project by our standards, but the approach is the same on every job.

Detail notes


  • New surface drainage plan and drainage engineering


  • Landscape design to direct water away from the building


  • Subfloor remediation costings and documentation through ECI


  • Independent spore sampling and IICRC-certified mould treatment


  • Completion testing to verify the result


  • Construction of the new bathrooms